Title of proposed Technical Paper:
This submission is for a Proprietary Session.
This submission is for a Technical Session.
Type of Presentation: Case History Unique Features
Project Name:
Project Location:
When was/will the project open to traffic?
Primary Topic Accelerated Bridge Construction Bolting & Fastening Bridge Demolition Bridge Maintenance Programs Bridge Painting Cable Stayed Bridges Computer Software Applications Construction Techniques & Planning Corrosion Mitigation Design Design/Build Techniques Detail Drawing Preparation Durability Economy Erection Engineering Practices & Standards Fabrication Techniques Foundations Topics Graffiti Removal Ground Modifications Heat straightening in the shop and during bridge maintenance repairs after traffic damage Innovative Design Concepts Innovative Financing Innovative Materials Applications Lessons from Bridge Failures Load Testing & Instrumentation Systems Long Span Bridges LRFD Movable Bridges MPT Construction Phasing NBIS Bridge Inspections Partnering Preservation Railroad and Transit Bridges Rapid Construction Rehabilitation and Strengthening Research Scour Investigations Security Issues & Solutions Segmental Concrete Bridges Seismic Design Surface Preparation & High Performance Coating Systems Timber Bridges Welding of Steel Bridges
Secondary Topic Accelerated Bridge Construction Bolting & Fastening Bridge Demolition Bridge Maintenance Programs Bridge Painting Cable Stayed Bridges Computer Software Applications Construction Techniques & Planning Corrosion Mitigation Design Design/Build Techniques Detail Drawing Preparation Durability Economy Erection Engineering Practices & Standards Fabrication Techniques Foundations Topics Graffiti Removal Ground Modifications Heat straightening in the shop and during bridge maintenance repairs after traffic damage Innovative Design Concepts Innovative Financing Innovative Materials Applications Lessons from Bridge Failures Load Testing & Instrumentation Systems Long Span Bridges LRFD Movable Bridges MPT Construction Phasing NBIS Bridge Inspections Partnering Preservation Railroad and Transit Bridges Rapid Construction Rehabilitation and Strengthening Research Scour Investigations Security Issues & Solutions Segmental Concrete Bridges Seismic Design Surface Preparation & High Performance Coating Systems Timber Bridges Welding of Steel Bridges
E-mail your abstract file as an attached file. Acceptable file formats are MS Word for Windows 95, 97 or 2000, 2003, 2007, WordPerfect 6.1 for Windows, or text file. If you are using a platform other than Windows, copy and paste the abstract text into the body of the e-mail message. Please include author's name within the content of the file.
AUTHORS MUST AGREE TO THIS SECTION.
AUTHOR OBLIGATION TO THE INTERNATIONAL BRIDGE CONFERENCE®: The IBC reserves the right of FIRST PUBLICATION of any papers accepted for PRESENTATION. If an author has a paper accepted for presentation, he/she must not submit it elsewhere for publication without the consent of the IBC COMMITTEE. If published by IBC, the paper becomes the copyright property of IBC.
It is recognized by the Engineers' Society of Western Pennsylvania that the authors reserve the following: (1) All proprietary rights other than copyright, such as patent rights. (2) The right to use all or part of the article in future works of their own, such as lectures, press releases, reviews, textbooks, or reprint books. Rights to reprint article from the IBC Proceedings may be granted provided the International Bridge Conference® receives a written request from the intended publisher and written concurrence from the author.
The author must check this box indicating that the author acknowledges his/her intent to submit for publication, and to adhere to all submission deadlines as required.
You will receive a confirmation of receipt of abstract within 2 business days of your electronic submission.